Project experience

Seven documented projects: assignments, responsibility and historical scope. These figures are not promises of future results.

Edited summaries from archived sources. Translations and historical facts await client review.

Production transfer of a safety relevant process from England to the Czech Republic

Transfer of a safety-critical production process from England to the Czech Republic, including staff training, plant and infrastructure setup, product transfer and changes to logistics.

Documented role

Role not separately specified in the source.

Historical scope

  • 60 employees

Complete factory relocation from the Czech Republic to Romania

Relocation of a factory from the Czech Republic to Romania, covering production and administration, staff training, production lines and the logistics chain at the new site.

Documented role

Project management

Historical scope

  • 350 employees
  • 11 production lines
  • 8,000 m² of production and logistics space

Production relocation from Spain to the Czech Republic for VW Seat OEM

Transfer of fuel supply unit assembly lines for VW Seat from Spain to the Czech Republic. The assignment included staff training, material flow and customer approval.

Documented role

Project coordinator and steering committee member

Historical scope

  • 150 employees
  • 4 production lines
  • 4,000 vehicles/day
  • 2,500 m² production and logistics space

Automotive production manager in the Czech Republic for VW/Audi/BMW OEM

Optimisation and restructuring of organisation and production at an automotive site in the Czech Republic. The assignment covered departments, material flow and team development.

Documented role

Managing all production processes and material flow

Historical scope

  • over 350 employees
  • Turnover: EUR 70 m
  • 32,000 headrests/day
  • 70,000 guiding parts/day
  • 5,000 m² production

Management of a site in Slovakia

Restructuring of a Slovak site producing customised wiring harnesses and cable assemblies. The assignment covered production, logistics, sales, expansion and project launches.

Documented role

Managing director

Historical scope

  • 350 employees
  • 10,000 m² of production and logistics space

Complete factory relocation from Germany to the Czech Republic

Relocation of an industrial plug and connector factory from Germany to the Czech Republic, including production and administration, staff training and expanded in-house production.

Documented role

Project management for the receiving site

Historical scope

  • 250 employees
  • 10,000 m² of production and logistics space

Complete factory relocation from Germany to the Czech Republic for VW/BMW OEM

Relocation of a radio and navigation equipment factory for VW/BMW from Germany to the Czech Republic. The assignment included phased transfers, material flow, staff training and customer approval.

Documented role

Project coordinator and steering committee member

Historical scope

  • 280 employees
  • 5 SMD production lines (double-sided)
  • 6 assembly lines for final assembly
  • 13,000 m² production and logistics space

Your contact

Let’s discuss your needs.

Do you need interim leadership, suitable specialists and executives, or support with operational change? Contact Peter Scholze.

Write an email

Peter Scholze, Kontaktperson bei UNIC DSI

Peter Scholze

UNIC DSI executive s.r.o.

+420 777 292 866